Eden Prairie Wood Flooring has installed, sanded and refinished wood flooring in Bloomington for more than twenty years, and a large share of that work arrives with a date already attached to it. A homeowner decides to sell, finds out what the city asks for first, and a floor that had another year left in it suddenly needs a decision this month.
We would rather that decision rest on numbers than on a hunch. On the first visit we read indoor relative humidity with a hygrometer and write the reading down, because a heated Minnesota house in January sits well under the thirty to fifty percent relative humidity band wood flooring is specified for, and that one number changes what we will and will not recommend.
What follows is what actually changes about this work inside the city limits: what has to be on file before a sign goes in the yard, which kinds of housing that reaches, and what a mid-century floor above the river bluff still has left to give.
A report that has to exist before the listing does

The City of Bloomington runs a Time-of-Sale Housing Inspection Program, and the ordering of it is the part that catches sellers out. The evaluation comes first, the report is filed with the City before the home is listed, and a copy of the original evaluation report goes in within seven calendar days after the evaluation. The paperwork leads and the listing follows.
The requirement is a filing, not a work order
It is worth being precise about that, because sellers arrive having heard a neighbor’s version of a different suburb’s program. What Bloomington requires is that the report be on file before the home is offered for sale. Which items get attention, in what order, and at what cost stays a conversation between a seller and their agent about price and marketability.
We do not write that report and we do not speculate about its contents. What it does to us is start a clock: the evaluation gets scheduled, the report gets filed, the listing goes up, and the floor is on camera at the first showing whether or not anything has happened to it.
Why that sequence squeezes a floor job
Sanding and refinishing is not a same-week service, and it is cure time rather than dry time that sets the day a household can put furniture back. Waterborne polyurethane takes foot traffic sooner than oil-modified polyurethane, but both cure on a schedule a cold house stretches, and we hand over those return-to-service numbers in writing rather than leaving them to be discovered.
So we plan backward from the calendar. If the evaluation is three weeks out, we would rather do a recoat now and a full sand after closing than start a 36-50-80 grit sequence that finishes the morning the photographer arrives.
What gets measured before a pre-sale quote
Before we quote any refinish on a house that is about to be listed, we measure the moisture content of the flooring and of the subfloor against each other, and both numbers go on the paperwork. A moisture content differential wide enough to produce cupping after coating is the one failure that costs a seller their date, and it is entirely predictable with a moisture meter and ten minutes.
Where the floor is genuinely finished — a sand-through from an earlier pass, overwood at the seams, a wear layer too thin to touch — we say so in the quote instead of selling a refinish that will not hold.
Looking for wood-flooring closer to Shorewood? See Wood-Flooring in Shorewood.
Every kind of home on the list, from detached house to mobile home
The program does not stop at detached houses. Single and two-family dwellings, condominiums, townhouses and mobile homes are all included when they are offered for sale, so the owner of a third-floor condominium and the owner of a 1950s rambler are working from the same requirement on the same schedule.
That breadth matches the housing itself. Of the city’s 39,261 housing units, 9.7 percent are single-unit attached structures and 19.2 percent sit in buildings of fifty units or more, which means a large share of the floors we are asked to look at have somebody living underneath them.
Attached housing changes the job, not just the paperwork
Before an upstairs job is scheduled we read the association’s governing documents — the declaration and bylaws that Minnesota Statutes 515B governs — and specify the underlayment to that building rather than to a general preference. Boards commonly set a minimum impact insulation class or sound transmission class, and the acoustic underlayment that satisfies one building is not always the product that satisfies the next.
Doing that first is far cheaper than doing it second. A nail-down floor laid over the wrong assembly is not adjustable afterward, and a floor that has to come back out is not a conversation anyone wants three weeks before a filing deadline.
A mobile home and a townhouse are not the same subfloor
Where the structure changes, the method follows it. Fastener gauge, fastener spacing schedule and the choice between nail-down, glue-down and a floating floor all depend on what is actually under the finish floor, and we confirm that by opening a section rather than guessing from the year on the record.
Across attached and manufactured housing we see more floating assemblies and thinner engineered product than in the detached stock, which is why we measure wear layer before quoting an engineered floor for a refinish. Past a certain thickness there is nothing left to sand, and a quote that skips that step is a quote for a sand-through.
Ownership shapes what people ask for as well. With 24,722 of 37,601 occupied units owner-occupied, most pre-sale calls come from people who have lived on the floor long enough to know exactly which board squeaks, and a subfloor screw-down with a handful of board replacements often settles more than a full refinish would.
The gap between finding out and being able to list
The interval between deciding to sell and being able to list is short, and in this climate the season usually decides what can be done inside it. A January reading in a heated house here routinely lands below the band the flooring was specified for, and the boards react long before anybody has made a plan.
Winter gapping is measured before it is called a defect
Seasonal gapping is the most common thing we are asked to fix during a winter pre-sale scramble, and a good share of it closes again by June. We measure the gaps and photograph them before anyone calls the floor defective, because the same boards filled in February will show compression set or crowning when the humidity comes back.
That is also where we lay out the conflict up front instead of handing over a humidistat setting and leaving. Raising indoor relative humidity is good for the floor and hard on windows in a cold snap, and the honest version names the tradeoff and the number rather than pretending the house has only one system in it.
Lower levels get a reading of their own
A lot of finished square footage in this city sits below grade, and a below-grade installation is quoted from a reading taken on the lower-level slab itself — a calcium chloride test or an in-situ relative humidity probe on that slab — never from the floor above it. The vapor retarder and its perm rating are specified from that number, not from a rule of thumb.
Permits, and pre-1978 housing
Refinishing an existing floor is finish work, and Minnesota Rules 1300.0120 carries the finish-work permit exemption that covers it; structural repair to a subfloor or a joist is a different question under the Minnesota State Building Code as administered by the City of Bloomington. We say which side of that line a job falls on before it starts rather than after.
Age matters more than either. With 66.8 percent of the city’s housing units built before 1980 and 3.3 percent before 1940, a great many of these floors fall inside the EPA RRP lead-safe rule’s pre-1978 definition. Sanding in those homes means HEPA-shrouded equipment and a contained work area, and dustless sanding is a containment method here rather than a marketing word.
None of that is optional and none of it is quick, which is the real reason we ask about the intended listing date on the first call. A schedule built around the work is calm. A schedule built around a date already published is not.
Mid-century oak above the river bluff, at its second refinish
The city sits on the north bank of the Minnesota River, ten miles south of downtown Minneapolis, and the housing that climbs back from the water is mostly mid-century. The 1950s are the single largest build decade at 22.3 percent of units, with the 1970s at 20.5 percent and the 1960s at 17.7 percent.
What a second refinish leaves you
A floor from those decades has usually been sanded at least once already, so the question on a pre-sale call is really how much material is left above the tongue. We check that at a register cut or a closet threshold before quoting, because a floor that has already given up a heavy pass will not survive an aggressive run through the machines.
Where the thickness allows it, the site-finished red oak and white oak laid in those years comes back better than anything we could install in its place. Where it does not, board replacement, a weave-in across the damaged run or a dutchman patch buys the floor another decade without taking the whole thing up.
The recoat is sometimes the right answer
We quote a screen-and-recoat honestly against a full sand-and-refinish, including the times the cheaper answer is the better one. A floor with intact finish, ordinary traffic wear and no water history takes a buff and coat in a fraction of the time and reads like a floor somebody maintained — which, ahead of a listing, is most of the point.
What a recoat cannot fix is worth naming out loud: deep drum marks or chatter marks left by an earlier pass, swirl marks sealed under the old coat, lathe checks opened by a run of dry winters, or a finish that has stopped bonding. Those want the full sequence, or they read straight through the new coat.
What leaves with the quote
Every quote goes out with a written grit sequence and finish schedule, the sheen level, and cure and return-to-service times that say plainly what a cold house does to them. A seller working to a filing deadline ought to be able to check the work against something, and we would rather be measured against our own document than against somebody’s memory of a phone call.
We plan the household before the first machine runs, too — where the furniture goes, where the pets go, and where people sleep while the finish cures. In an occupied home about to go on the market, that plan is the difference between a smooth two weeks and a bad one.
- 20+ Years Experience
- Free Written Quotes
- Moisture Readings on Every Quote










