Eden Prairie Wood Flooring has installed, sanded and finished wood flooring in Shorewood for more than 20 years, and a large share of that work happens in homes where two parties have to say yes: the owner who is paying for the floor, and the association whose rules that owner agreed to. Those two answers are not always the same, and the order you collect them in decides whether the job starts on the date it was promised.
So an attached-home project here begins with the governing documents open on the table next to the moisture meter. What the declaration and the rules say about underlayment, about which hours a machine may run, and about who has to approve a sample is not paperwork around the job. It is part of the specification we quote to.
The rest is the trade itself: readings taken before material is ordered, a grit sequence and finish schedule written down rather than described out loud, and cure times given as numbers a household can plan around. Here is how that plays out in Shorewood in particular.
Townhomes owned by the people living in them

Shorewood is an owner’s market nearly end to end. Of 2,975 occupied housing units, 2,772 are owner-occupied, or 93.2 percent, and the pattern does not stop at the detached homes. The city counts 482 single-unit attached homes, 15.8 percent of its 3,041 housing units, and 422 of those 482 are owned by the people who live in them.
That number changes the brief we are handed. Someone specifying a floor they expect to walk on for a decade asks about wear layer, refinish potential and how the surface behaves in February. The questions are about keeping a floor, not about the cheapest surface that will last until somebody else’s problem.
A stock built largely in the 1980s and 1990s
Those two decades account for 47.1 percent of everything standing here, 712 units from the 1980s and 720 from the 1990s. In practice that means plywood and OSB subfloors, framed floor systems over conditioned lower levels, and a main level that is usually the one an owner wants in wood first.
We measure the subfloor before pricing rather than after. A deck that reads within a normal moisture content differential of the flooring takes a nail-down or glue-down installation on schedule; one that does not needs time, and that conversation belongs in the quote rather than on the morning the boards arrive.
The owner is the one home in January
Wood flooring is specified to perform between thirty and fifty percent relative humidity at sixty to eighty degrees Fahrenheit, and a heated Minnesota house sits below that band through the winter without supplemental humidification. The January climatological normal dew point at the Minneapolis-Saint Paul station falls between four and ten degrees Fahrenheit depending on the normals period cited, which is the short version of why indoor air dries out the week the furnace takes over.
We read indoor relative humidity with a hygrometer on the first visit and write the number on the paperwork. We also say plainly what a humidifier set high enough to satisfy the floor will do to your windows during a cold snap, because that conflict is real and an owner should get to decide it rather than inherit a setting.
Seasonal gapping gets measured and photographed before anyone calls it a defect. A good share of the gaps that appear in February have closed again by June, and dry cupping during a heating season is a different problem from a leak. Telling those apart is a measurement, not an opinion.
Looking for wood-flooring closer to Chaska? See Wood-Flooring Services in Chaska.
Reading the declaration before the underlayment is ordered
An association’s governing documents are the specification nobody hands you alongside the flooring samples. Minnesota associations organized as common interest communities operate under the Minnesota Common Interest Ownership Act, and the declaration and bylaws recorded under Minnesota Statutes chapter 515B are where an individual community’s flooring rules actually live.
We read them before anything is ordered. Sometimes a specific underlayment is named. Sometimes there is a performance expectation a board wants a submittal against, sometimes a limit on hard surface above a shared ceiling, and sometimes nothing at all, but an absence has to be verified rather than assumed, because a floor installed against a rule comes back up at the owner’s expense.
What the documents tend to control
Four items come up again and again: what may be installed above a neighbor’s ceiling, which underlayment or assembly the association will accept, what has to be submitted and approved before work begins, and when noise-producing work may run. We pull each of them out in writing so the quote carries the same constraints the board does.
Any sound requirement attached to your floor comes from that document rather than from a rule of thumb we bring with us. We quote the assembly your community accepts and name it on the paperwork, which is usually what a board is looking for when it reviews the request.
Underlayment specified to the building, not to the box
Acoustic underlayment is sold as a category, and the label on the roll is no substitute for what a particular assembly needs. A floating floor over a mat, a glue-down over a membrane and a nail-down over a framed deck are three different assemblies with three different results underfoot, and only one of them may be the one your documents permit.
We specify the underlayment to the building and the document, then put the product, the thickness and the installation method on the quote next to a written 36-50-80 grit sequence and finish schedule for any sanding portion. The work should be checkable against something afterward.
Where an existing engineered floor is a candidate for refinishing, we measure the wear layer before quoting one. Past a certain thinness there is nothing left to sand, and board replacement or a screen-and-recoat becomes the answer that keeps the floor instead of the one that ends it. A recoat is quoted honestly against a full sand-and-refinish, including the cases where the cheaper answer is the correct one.
Party-wall assemblies at grade, and where sound actually travels
Attached homes here meet at a party wall, and the lower level of many of them sits at or near grade. Both facts change the work. A floor fastened or bonded across an assembly that was meant to stay decoupled carries every footfall into the next household, and a slab carries moisture a framed deck never will.
Readings taken on the slab itself
A lower-level slab gets its own moisture readings, taken on that slab. A number carried down from the floor above says nothing about what sits under the lower level, and below-grade and on-grade installations fail on exactly that shortcut.
Depending on the assembly we use a calcium chloride test or an ASTM F2170 in-situ relative humidity probe, then match the vapor retarder and the adhesive to what comes back rather than to what is usually fine. The flooring’s moisture content and the subfloor’s both go on the paperwork, measured against each other, before a board goes down.
Footings in this county are built to Minnesota Rules 1303.1600 Zone II, which names Hennepin County and sets three and one-half feet as the minimum depth due to freezing, with less permitted only on supporting evidence from an engineer competent in soil mechanics. That is a foundation fact rather than a flooring one, but it is part of why a lower level here is a conditioned, finished room an owner wants wood in.
Expansion and transitions at the shared wall
Expansion gaps at a party wall get the same attention as the ones at an exterior wall, and nothing is fastened through an assembly intended to move or to stay isolated. Where the floor meets a stair nosing, a threshold or a T-mold near the wall line, that detail is decided before installation rather than improvised at the end of a run.
Material is acclimated to the house it is going into rather than to a garage or a truck, and we work from the equilibrium moisture content of the space instead of a fixed number of days. In an attached home with a conditioned lower level and a main level over framing, the two spaces can read differently, so we check both.
Getting the board’s answer before the crew is booked
A city permit and an association approval are different things, and on a floor here typically only one of them applies. Minnesota Rules 1300.0120, subpart 4 exempts painting, papering, tiling, carpeting, cabinets, countertops and similar finish work from permit, while stating that an exemption does not authorize work in violation of the code. The Minnesota State Building Code is administered in this city by the City of Shorewood, in Hennepin County.
The approval is the long pole
What holds up a start date is almost never the city. It is the week or the month between submitting a request to a board and getting a written answer back. We run the sequence in that order: documents read, assembly specified, submittal prepared, approval in hand, then dates.
Booking a crew against an approval that has not arrived is how one job turns into two. An owner who is also the party bound by the rules has nobody to hand that risk to, which is the practical consequence of a market this close to fully owner-occupied.
Cure times, and a household that still has to live here
Dry time and cure time are not the same number, and a cool house stretches both. Return-to-service times go in writing, including when the floor can be walked on in socks, when furniture can come back, when rugs are safe again, and what a January indoor temperature does to a waterborne polyurethane’s schedule.
Before the first machine runs we plan where the furniture goes, where pets will be and where the household will sleep. In an attached home that plan also covers which door the equipment comes through and which hours the association allows it to run.
Older addresses and the federal lead rule
Minnesota is not an EPA-authorized state for the Renovation, Repair and Painting rule, so the federal EPA program governs sanding of finished surfaces in pre-1978 housing. With 57.1 percent of the city’s housing units predating 1980, that is a question worth answering at a specific address rather than assuming, and dust containment with HEPA-shrouded equipment is how we work regardless.
Shorewood sits around the southern shore of Lake Minnetonka with State Highway 7 running through as a main route, which for our purposes mostly decides how material and equipment reach a townhome driveway on a weekday morning. The city incorporated as a village in 1956 and became a city in 1974, organized by its own residents from the start, which is not a bad description of how a flooring job still gets decided here.
- 20+ Years Experience
- Free Written Quotes
- Moisture Readings on Every Quote










